The Ministry of Public Works of Chile awarded Eductrade, as part of a consortium with BlackRock and GIA+A, the contract for the construction and operation of the public work project known as Red de los Ríos – Los Lagos, valued at 270 million euros
Hospital Regional de Villa Dolores
Eductrade is in the final stage of the Villa Dolores Regional Hospital turnkey project in Córdoba (Argentina), through the architectural and functional design of the centre.
The Villa Dolores Regional Hospital is a project consisting of expanding, remodelling and upgrading the hospital to “highly complex” in order to provide healthcare to the residents of Villa Dolores and the Traslasierra Valley.
The hospital includes an area of 3590 m² that will be newly built and 4060 m² that will be remodelled. The development of the project is shown below.
The hospital consists of a Pharmacy Service, Laboratory, PICU, Diagnostic Imaging, Vaccination Centre, Neonatology, Delivery and Obstetrics Room, and Kinesiology and Surgery Room containing 3 operating rooms.
Asistencia en Educación Secundaria
Eductrade has been awarded the “Technical assistance to increase secondary education attendance and enrolment rates” contract in Turkey.
Hospital y Laboratorio
Construction of a primary hospital in the Wiwilí de Jinotega community. The covered area of the project consists of a 2,884.59 m² constructed area, distributed across the following buildings:
- Administration Building.
- General Services Building.
- Hospital building.
- Emergency building.
- Outpatient care and diagnosis.
University of Cuenca
Eductrade ha sido adjudicataria de la siguiente licitación con fecha 14 de Octubre 2020
Spain – Ongoing
That’s English! is an educational programme aimed at teaching the English language through distance learning.
Nicaragua – Ongoing
New hospital that increases healthcare coverage and improves the quality of healthcare services. It will have 396 beds, 8 operating rooms, and more than 65 specialized units.
Argentina – Ongoing
Comprehensive execution of the project. It has a sustainable approach capable of producing photovoltaic electrical energy through solar panels. This hospital will serve a regional demand of more than 100 thousand inhabitants. Currently under construction.
Spain – Ongoing
Bolivia – Ongoing
Provision of Equipment to El Alto Sur Hospital.