Business Area Breadcrumb Connector Manzanillo III Combined Cycle Power Plant

Manzanillo III Combined Cycle Power Plant

Colima, Mexico

Building

The project includes the construction of the Technical Buildings, Auxiliary Equipment Foundations and Seawater Intake works.

A joint venture with Ingeniería y Proyectos Tyson, S.A. de C.V.

Harbin Electric International Company, Ltd. is currently building this project for the Federal Electricity Commission (CFE).

 15,18 M €

The Manuel Álvarez Moreno Thermoelectric Complex, currently integrated by the Manzanillo I and Manzanillo II Thermoelectric Plants, has 7% of the effective capacity of the CFE, being the largest complex in the country.
The civil works of lot 2 include mainly:
  • TG Gas Conditioning construction (21 x 22)
  • Foundation Pump Room PCI
  • Pump room
  • Chemical Drainage and HDPE chemical drainage ducts
  • External structures in chemical water zone
  • Neutralization well
  • Potable water, industrial fire-fighting and condensate tanks